|
Re: paper: Stop the Stop Build - Counterpoint
Quote:
Originally Posted by AdamHeard
You're completely missing the point about having acccess to your robot after having competed once, and before having competed again.
From some combination of outside help and seeing what others teams have done, 2-8 hours in this time can be far more valuable than 2 weeks during the build portion for a team that isn't capable of finishing on time currently.
|
You are right - I did blow right past that. I apologize. Ima deleting my earlier post.
__________________
Blake Ross, For emailing me, in the verizon.net domain, I am blake
VRC Team Mentor, FTC volunteer, 5th Gear Developer, Husband, Father, Triangle Fraternity Alumnus (ky 76), U Ky BSEE, Tau Beta Pi, Eta Kappa Nu, Kentucky Colonel
Words/phrases I avoid: basis, mitigate, leveraging, transitioning, impact (instead of affect/effect), facilitate, programmatic, problematic, issue (instead of problem), latency (instead of delay), dependency (instead of prerequisite), connectivity, usage & utilize (instead of use), downed, functionality, functional, power on, descore, alumni (instead of alumnus/alumna), the enterprise, methodology, nomenclature, form factor (instead of size or shape), competency, modality, provided(with), provision(ing), irregardless/irrespective, signage, colorized, pulsating, ideate
Last edited by gblake : 09-09-2016 at 19:25.
|