View Single Post
  #26   Spotlight this post!  
Unread 10-10-2016, 11:04 PM
Chris is me's Avatar
Chris is me Chris is me is offline
no bag, vex only, final destination
AKA: Pinecone
FRC #0228 (GUS Robotics); FRC #2170 (Titanium Tomahawks)
Team Role: Mentor
 
Join Date: Dec 2008
Rookie Year: 2006
Location: Glastonbury, CT
Posts: 7,589
Chris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond repute
Send a message via AIM to Chris is me
Re: pic: Team230 Damaged Frame Rail

Quote:
Originally Posted by Thayer McCollum View Post
So I suppose I should have clarified. I agree that structurally the tube concept is overkill. It adds support the rail doesn't really need. We did this because we felt that just pressing the bearings into the rail would cause them to fall out easily. Is that not the case? Does 1/8" wall easily support bearings without them falling out? Because in my experience that hasn't happened. If someone could tell me how to put the bearings in without them falling out I would be happy to learn. (Because those tubes really sucked to put in...)
Bearing retention really has very little to do with the wall thickness of the material the bearing is pressed in. How the hole is sized is the biggest factor, really. Machine the hole a thou or two undersize for a nice press fit, but not so much under the bearing will seize. If you can't do this, using green loctite (gap filling) will help hold the bearing press fit in securely. Otherwise, you can use the hardware on your shaft to hold your bearings in (spacers, etc).

I would definitely not recommend an E-clip to do this if the E-clip is between loads, only on the end. And even then a snap ring is simply the better tool for the job.
__________________
Mentor / Drive Coach: 228 (2016-?)
...2016 Waterbury SFs (with 3314, 3719), RIDE #2 Seed / Winners (with 1058, 6153), Carver QFs (with 503, 359, 4607)
Mentor / Consultant Person: 2170 (2017-?)
---
College Mentor: 2791 (2010-2015)
...2015 TVR Motorola Quality, FLR GM Industrial Design
...2014 FLR Motorola Quality / SFs (with 341, 4930)
...2013 BAE Motorola Quality, WPI Regional #1 Seed / Delphi Excellence in Engineering / Finalists (with 20, 3182)
...2012 BAE Imagery / Finalists (with 1519, 885), CT Xerox Creativity / SFs (with 2168, 118)
Student: 1714 (2009) - 2009 Minnesota 10,000 Lakes Regional Winners (with 2826, 2470)
2791 Build Season Photo Gallery - Look here for mechanism photos My Robotics Blog (Updated April 11 2014)
Reply With Quote