View Single Post
  #7   Spotlight this post!  
Unread 18-10-2016, 16:21
Brandon Holley's Avatar
Brandon Holley Brandon Holley is offline
Chase perfection. Catch excellence.
AKA: Let's bring CD back to the way it used to be
FRC #0125 (NU-TRONs, Team #11 Alumni (GO MORT))
Team Role: Engineer
 
Join Date: Jan 2004
Rookie Year: 2001
Location: Boston, MA
Posts: 2,590
Brandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond repute
Send a message via AIM to Brandon Holley
Re: Discussion: Release Team Field Drawings Early

As someone who has been leading field builds and hosting kickoffs since 2008, I just wanted to add a couple bits of color to the discussion.

While I think the advantages to host teams/mentors are obvious, it is definitely more of a mixed bag than a slam dunk advantage. Deciphering the drawings is a TON of work that then needs to be built into a BOM and budget. For me, I also do the materials run each year, which means I get to go buy the sometimes insane amount of wood required.

Often times, what we build is completely useless, or misleading. I cannot tell you how much effort went into building the 2013 practice version Pyramid that was completely useless for anything but aesthetic or scale. It did help the 45 teams at the Kickoff we hosted get a sense for scale, but it was unuseable for climbing. The 2010 tower had 4X4 sides, not round bar needed for most curl up hangers. The 2014 practice Truss was SO not worth the effort for something that was essentially a volleyball net.

All of those projects required dozens or even hundreds of man hours to pull off. It was also pulled off at a time where a lot of us want to spend time with family and enjoy the calm before the storm. On top of that, in many instances, the version we built needed heavy modifcation or complete rebuild to fulfill the teams needs. This meant duplicating the work we already did.

It's a lot of wasted time, money, effort, etc. There is definitely advantages that come from it for the team having some elements done, but wanted to frame the effort and risk behind it.

-Brando
__________________
MORT (Team 11) '01-'05 :
-2005 New Jersey Regional Chairman's Award Winners
-2013 MORT Hall of Fame Inductee

NUTRONs (Team 125) '05-???
2007 Boston Regional Winners
2008 & 2009 Boston Regional Driving Tomorrow's Technology Award
2010 Boston Regional Creativity Award
2011 Bayou Regional Finalists, Innovation in Control Award, Boston Regional Finalists, Industrial Design Award
2012 New York City Regional Winners, Boston Regional Finalists, IRI Mentor of the Year
2013 Orlando Regional Finalists, Industrial Design Award, Boston Regional Winners, Pine Tree Regional Finalists
2014 Rhode Island District Winners, Excellence in Engineering Award, Northeastern University District Winners, Industrial Design Award, Pine Tree District Chairman's Award, Pine Tree District Winners
2015 South Florida Regional Chairman's Award, NU District Winners, NEDCMP Industrial Design Award, Hopper Division Finalists, Hopper/Newton Gracious Professionalism Award
Reply With Quote