Re: Eliminating "Start Build Day"
Folks,
Would anyone disagree with the broad statement that a dramatically longer build season is likely to increase FRC teams' appetite for cash (to use experimenting with and/or improving the robot(s) they build)?
I understand that rush-shipping costs might generally drop (so long as good ideas are scarce near the end of the new build period). However, I suspect that in a dramatically longer build season, that reduction would be more than offset by the extra parts an evolving robot would consume.
For that reason, I think a dramatically earlier start date would put cash-poor teams at a greater disadvantage than the current season does.
I am assuming that human nature will result in most teams using a dramatically longer build season to put more labor-hours and more design iterations into their robot.
If I'm right, the increased hunger for cash would be one "Con" to remember.
Blake
__________________
Blake Ross, For emailing me, in the verizon.net domain, I am blake
VRC Team Mentor, FTC volunteer, 5th Gear Developer, Husband, Father, Triangle Fraternity Alumnus (ky 76), U Ky BSEE, Tau Beta Pi, Eta Kappa Nu, Kentucky Colonel
Words/phrases I avoid: basis, mitigate, leveraging, transitioning, impact (instead of affect/effect), facilitate, programmatic, problematic, issue (instead of problem), latency (instead of delay), dependency (instead of prerequisite), connectivity, usage & utilize (instead of use), downed, functionality, functional, power on, descore, alumni (instead of alumnus/alumna), the enterprise, methodology, nomenclature, form factor (instead of size or shape), competency, modality, provided(with), provision(ing), irregardless/irrespective, signage, colorized, pulsating, ideate
|