Re: Annual/Seasonal maintenance items
Load testing the batteries is the only way to go.
Buy one of these: CBA IV from West Mountain Radios
We load test and profile our batteries starting the first week of build season. It's an easy routine to test one or two a day. By the time b&g comes around every battery has been tested at least twice (even new ones) and we have our battery line up ready to go.
Between this and the battery beak we have had zero battery failures since we started using them.
__________________
"Champions are champions not because they do anything extraordinary but because they do the ordinary things better than anyone else." —Chuck Knoll
2015 Indianapolis District Winner
2014 Boilermaker Regional Industrial Design Award
2013 Smoky Mountain Regional Industrial Design Award
2012 Boilermaker Engineering Excellence Award
2010 Boilermaker Rockwell Innovation in Control Award.
2009 Buckeye J&J Gracious Professionalism Award
2009 Boilermaker J&J Gracious Professionalism Award
2008 Boilermaker J&J Gracious Professionalism Award
2007 St Louis Regional Winners
|