Quote:
Originally Posted by NAP17
When a robot is putting a gear on the spring can the pilot pull the rope to the ship at the same time to help the robot?
This is for strategy
|
Are you talking about the rope/handle that pulls up the lift? Or the rope that the robot eventually climbs?
PILOTS aren't allowed to release the climbing ROPE until the last 30 seconds, and even after that, can't reach through the PORT to touch the ROPE.
On the other hand, PILOTS are allowed to operate the LIFT with its rope handle. There's some debate over whether they can move a LIFT while a robot is interacting with it. There won't be a definitive answer on that until there's an official Q&A on it.