View Single Post
  #4   Spotlight this post!  
Unread 11-01-2017, 10:39
pilleya's Avatar
pilleya pilleya is online now
Elec+Mech
AKA: Alastair Pilley
FRC #4613 (Barker Redbacks)
Team Role: Mechanical
 
Join Date: May 2015
Rookie Year: 2013
Location: Sydney, Australia
Posts: 455
pilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond repute
Re: pic: Step 1. Field Step 2. ??????? Step 3. Robot

Quote:
Originally Posted by WSiggs View Post
What material did you use for the high efficiency boiler goal? Also do you plan on adding gear lifts and davits onto the airship, or make those separately?
For our boiler we simply measured the diameter and length the pipe from the CAD(15inches) then found the circumference, added joining holes( 5/32 rivets every 2 inches worked) and cut it out on our router. 0.118(3mmish) polycarb worked fine for us, but took a little bit of effort to hold it together while rivetting( by little bit I mean person sitting on it )

We did the same for the funnel, just measured, laid it out in 2D in SW then cut it on our router.

Last edited by pilleya : 11-01-2017 at 10:42.
Reply With Quote