Thread: Team Update 2
View Single Post
  #36   Spotlight this post!  
Unread 13-01-2017, 19:49
Cothron Theiss's Avatar
Cothron Theiss Cothron Theiss is offline
Registered Muser
FRC #4462 (Full Metal Jackets)
Team Role: College Student
 
Join Date: Feb 2016
Rookie Year: 2013
Location: Kingston, Tennessee
Posts: 588
Cothron Theiss has a reputation beyond reputeCothron Theiss has a reputation beyond reputeCothron Theiss has a reputation beyond reputeCothron Theiss has a reputation beyond reputeCothron Theiss has a reputation beyond reputeCothron Theiss has a reputation beyond reputeCothron Theiss has a reputation beyond reputeCothron Theiss has a reputation beyond reputeCothron Theiss has a reputation beyond reputeCothron Theiss has a reputation beyond reputeCothron Theiss has a reputation beyond repute
Re: Team Update 2

Quote:
Originally Posted by Eric Scheuing View Post
Question on the whole velcro thing. It looked like the loop holding the rope up for most of the match was made of velcro. Should teams be concerned that their rope won't deploy properly and they won't be able to climb?
That is an excellent point if that's the case. Thankfully, the rope is released by the human players, so the human player should be able to remove the retaining strap from the rope even if it does present issues.
__________________
"It's taking longer than expected, which was to be expected."
Reply With Quote