|
Re: At What Point Does Your Team Get Your Robot Anodized?
Last year we powder coated. We partially assembled the drivetrain frame and sent that along with the rest of our finished parts to a friend of the team who had his own powder coating setup for snowmobile parts. I believe we had it done four or five days before bag, maybe as much as a week. Got it all done in a weekend.
__________________
Design/fab team 2011-2013
Design/fab mentor 2014--
There are three types of people in the world:
1. Those who make things happen
2. Those who watch things happen
3. Those who wonder what happened.
|