View Single Post
  #15   Spotlight this post!  
Unread 20-01-2017, 14:18
rich2202 rich2202 is offline
Registered User
FRC #2202 (BEAST Robotics)
Team Role: Mentor
 
Join Date: Jan 2012
Rookie Year: 2012
Location: Wisconsin
Posts: 1,275
rich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond reputerich2202 has a reputation beyond repute
Re: (New)matics advice

Mount the following where the Robot Inspector can easily see (read) them:
1) High Pressure Guage
2) Low Pressure Gauges
3) Switch (RI will need to short it out)

Mount the dump valve where it can be easily and safely reached, and protect it from accidental bumping.

Follow the diagram in the manual so you have all the pieces in the right places.

Adjust your high pressure relief valve to the proper specs.

ONE AND ONLY ONE Compressor. Backup Compressor allowed in the Pit, but not connected to anything.
__________________

Reply With Quote