Quote:
Originally Posted by bmammen
Yes, thank you for pointing that out! Can anyone tell me if the loading chutes extend past the field wall and onto the field at all? I don't see it in the Field Component drawings, however in some of the pictures it looks like the end of the chute extends onto the field a couple of inches possibly.
|
Quote:
Originally Posted by JR0405
No they don't
|
The ramps DO extend out from the legs of the Chute Assembly (pg 163 and pg 166 of the current field drawings), but they are flush with the wall of the loading station (pg 146). If you get in good practice using a team version of the station, you will need to add a wall out at the vertical plane which includes the end of the ramp. And add a sea of balls and the side walls.