|
Build time
What was your approximate build time on these dual motor gear boxes. We are try to build the technokats design this fall to see how long and what modifications we need to make for our application. We do have a CNC lathe but our CNC mill is broken but we hope to repair it within the next month. This is being built with our machine shop class at our school so we have one experience machinist along with 5 students working with our robotics team. These designs are going to help us greatly in generating ideas with our students and engineers on ideas for future parts. This is top notch work.
Matthew Hillis
Ubergeeks
|