View Single Post
  #9   Spotlight this post!  
Unread 06-08-2003, 12:00
Matt Reiland's Avatar
Matt Reiland Matt Reiland is offline
'The' drive behind the drive
None #0226 (TEC CReW Hammerheads)
Team Role: Engineer
 
Join Date: May 2001
Rookie Year: 1999
Location: Troy Michigan
Posts: 712
Matt Reiland has a reputation beyond reputeMatt Reiland has a reputation beyond reputeMatt Reiland has a reputation beyond reputeMatt Reiland has a reputation beyond reputeMatt Reiland has a reputation beyond reputeMatt Reiland has a reputation beyond reputeMatt Reiland has a reputation beyond reputeMatt Reiland has a reputation beyond reputeMatt Reiland has a reputation beyond reputeMatt Reiland has a reputation beyond reputeMatt Reiland has a reputation beyond repute
Re: Build time

Quote:
Originally posted by Matthew_H
What was your approximate build time on these dual motor gear boxes. We are try to build the technokats design this fall to see how long and what modifications we need to make for our application. We do have a CNC lathe but our CNC mill is broken but we hope to repair it within the next month. This is being built with our machine shop class at our school so we have one experience machinist along with 5 students working with our robotics team. These designs are going to help us greatly in generating ideas with our students and engineers on ideas for future parts. This is top notch work.


Matthew Hillis
Ubergeeks
Matt,

We did something similar to what you are thinking last year. The technocats design (with a little modification) can be completed without much CNC work. The hard parts of the design are the Shift Dog, the output shaft, and the 2 output gears. The output shaft can be done on a manual mill and a manual lathe without too much hassle. The dog & output gears are also somewhat difficult but they could be done on a manual mill with a rotary table to get the angles right. Once these 4 pieces are complete the rest of the parts can be done fairly easily on manual tools. I would start with those four pieces and modify the design to your needs after that.

Matt

Just drop a message here if you need help and I am sure you will get it.
__________________
Robonaut Next Generation Control System Development

2003 GLR Champions (302,67,226)
2003 Buckeye Semi-Finalists(902,494,226)
2002 Nationals QuarterFinalists
2001 West MI QuarterFinalists
2000 GLR Semi-Finalists
Reply With Quote