View Single Post
  #1   Spotlight this post!  
Unread 15-02-2002, 14:18
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,798
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Running wire through the tubing is great way to protect the wires and manage the neatness of the robot if you remember a few small items.
1. Make sure the mechanical guys know that you have wires running through the tubing so that they DO NOT drill, tap, weld, or crush the tubing.
2. Make sure that sharp edges (i.e. drilled holes, saw edges, joined parts) are filed clean and deburred before you pull the wires through. Once you pull you will never be able to inspect them again.
3. Don't over stuff wires into a tube, their current capacity rating goes way down when you do that.
4. Never pull wires that have a junction, connector, wire splice or soldered joint inside the tube. It is not done in practice and should not be done on the robot. Joints come apart when you least expect and you can't reach into the tube to reconnect.
Good Luck All
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.