View Single Post
  #9   Spotlight this post!  
Unread 12-01-2004, 01:02
Dave Flowerday Dave Flowerday is offline
Software Engineer
VRC #0111 (Wildstang)
Team Role: Engineer
 
Join Date: Feb 2002
Rookie Year: 1995
Location: North Barrington, IL
Posts: 1,366
Dave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond repute
Re: Out Of Money already! - <R71>

Quote:
Originally Posted by Joe Ross
Last year the limit was $400. I assume they lowered the limit because with the new control system, there is much less of a reason for a second microprocessor. However, I have a feeling that FIRST didn't realize the consequences of cutting it in half.
Last year the limit on custom electronics was $200. They upped it from the $100 limit in 2002. Nothing has changed as far as I can tell (with the exception Joe mentioned - with wire etc. not being free).