|
Re: Who is behind schedule
This year I have spent alot more time designing it in CAD. The entire robot will be in CAD, down to the electronics. But in the end, it makes things go SOOoo much faster when building.
I would say that my team is ahead, except for the drivetrain.
This year i wanted to do a 2sp shifter, but with no experience, not a lot of room on the bot and only 4 weeks left, were going to go with a single spd.
Kevin
|