View Single Post
  #9   Spotlight this post!  
Unread 07-02-2004, 02:36
Elgin Clock's Avatar
Elgin Clock Elgin Clock is offline
updates this status less than FB!
AKA: the one who "will break into your thoughts..."
FRC #0237 (Black Magic)
Team Role: Mentor
 
Join Date: May 2001
Rookie Year: 2001
Location: H20-Town, Connecticut
Posts: 7,773
Elgin Clock has a reputation beyond reputeElgin Clock has a reputation beyond reputeElgin Clock has a reputation beyond reputeElgin Clock has a reputation beyond reputeElgin Clock has a reputation beyond reputeElgin Clock has a reputation beyond reputeElgin Clock has a reputation beyond reputeElgin Clock has a reputation beyond reputeElgin Clock has a reputation beyond reputeElgin Clock has a reputation beyond reputeElgin Clock has a reputation beyond repute
Send a message via AIM to Elgin Clock
Re: Transmission HELP!!!

Quote:
Originally Posted by Andrew
I ordered some 0.7 module gears over the summer from PIC, not the 55 tooth gear. The delivery time was at least three weeks. I would suggest for those people using 0.7 module gears to get their orders in now if they want to have the parts by the end of the build phase.

I may have had an odd part (48 tooth and 52 tooth). But, better safe than sorry.
We have decided to use this design this year, and fortunately the supplier you mention is right in our own backyard.. But we still had a very considerable lead time until one of our engineers talked to the guy on the shop floor at PIC and sweet talked his way into making them push our job ahead of some others because of our situation! Hehehehe!