Thread: Andymark.biz
View Single Post
  #28   Spotlight this post!  
Unread 11-10-2004, 14:59
Andy Baker's Avatar Woodie Flowers Award
Andy Baker Andy Baker is offline
President, AndyMark, Inc.
FRC #3940 (CyberTooth)
Team Role: Engineer
 
Join Date: May 2001
Rookie Year: 1998
Location: Kokomo, Indiana
Posts: 3,417
Andy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond repute
Send a message via AIM to Andy Baker
Re: Andymark.biz

Quote:
Originally Posted by Gary Dillard
Andy:

For the omni wheels, the assembly drawing and the step file show the inner 6 button head screws at 60 degrees installed from one side; the photo shows 3 at 120 degrees. I'm guessing the other 3 are on the other side, since it allows both plates to be the same part by clocking it (the step file shows the clearance) - is that correct? Could made a difference if someone were putting that face close to a mount bearing and didn't leave clearance for the screws.

Looks pretty sweet, for sure. We're still working on Mod 3 to our omni wheels - depending on resources we may use yours come build season though.
Thanks, Gary. You are correct. Those 3 screws on the step file need to be on the other side of the wheel, as shown in the picture. I will update the CAD info soon.

Andy

Last edited by Andy Baker : 11-10-2004 at 15:19.