Quote:
|
Originally Posted by Max Lobovsky
I can't imagine that you are talking about code for the Robot Controller.
|
Quote:
|
That's what I suspected, it wasn't clear form his post.
|
Sorry about that. Yes, my example referred to a real world situation. In particular it was for a software patch for Nextel.
In terms of robot controller software, we ususally get everything checked in (commit) and labeled when we have a milestone, or at key times such as we ships with the robot, and before/after each competition. This allows us to always have something to fall back on in case something really goes wrong.