View Single Post
  #12   Spotlight this post!  
Unread 04-11-2004, 22:10
Dave Scheck's Avatar
Dave Scheck Dave Scheck is offline
Registered User
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Feb 2003
Rookie Year: 2002
Location: Arlington Heights, IL
Posts: 574
Dave Scheck has a reputation beyond reputeDave Scheck has a reputation beyond reputeDave Scheck has a reputation beyond reputeDave Scheck has a reputation beyond reputeDave Scheck has a reputation beyond reputeDave Scheck has a reputation beyond reputeDave Scheck has a reputation beyond reputeDave Scheck has a reputation beyond reputeDave Scheck has a reputation beyond reputeDave Scheck has a reputation beyond reputeDave Scheck has a reputation beyond repute
Re: Versioning systems

Quote:
Originally Posted by Max Lobovsky
I can't imagine that you are talking about code for the Robot Controller.
Quote:
That's what I suspected, it wasn't clear form his post.
Sorry about that. Yes, my example referred to a real world situation. In particular it was for a software patch for Nextel.

In terms of robot controller software, we ususally get everything checked in (commit) and labeled when we have a milestone, or at key times such as we ships with the robot, and before/after each competition. This allows us to always have something to fall back on in case something really goes wrong.

Last edited by Dave Scheck : 04-11-2004 at 22:17.