View Single Post
  #24   Spotlight this post!  
Unread 08-12-2004, 11:30
Peter Matteson's Avatar
Peter Matteson Peter Matteson is offline
Ambitious but rubbish!
FRC #0177 (Bobcat Robotics)
Team Role: Engineer
 
Join Date: Sep 2003
Rookie Year: 2003
Location: South Windsor, CT
Posts: 1,653
Peter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond repute
Re: YMTC: Can teams start cutting metal for 2005?

Quote:
Originally Posted by Ian W.
If you're cutting a piece of metal from one big rectangle into two smaller rectangles, go for it, because you're not doing anything that would be designing or whatnot. I mean, if you have a big piece of aluminum, but need a chunk off of it for something now, and you're saving the rest for build, then what's the big deal? There's no real option for this, so I didn't vote above.
The way the earlier posts this were written it seemed to me people were condoning a "Cut your materials to size now and wait until kickoff day to weld it" plan off action. Not cutting a piece of material to use it for something else now or even cutting down say a 20' piece of box Al so it fits in your storage area.

Last edited by Peter Matteson : 08-12-2004 at 11:32. Reason: Grammatical problems, English speak we good here. :)
Reply With Quote