View Single Post
  #22   Spotlight this post!  
Unread 05-01-2005, 18:17
Rickertsen2 Rickertsen2 is offline
Umm Errr...
None #1139 (Chamblee Gear Grinders)
Team Role: Alumni
 
Join Date: Dec 2002
Rookie Year: 2002
Location: ATL
Posts: 1,421
Rickertsen2 has a brilliant futureRickertsen2 has a brilliant futureRickertsen2 has a brilliant futureRickertsen2 has a brilliant futureRickertsen2 has a brilliant futureRickertsen2 has a brilliant futureRickertsen2 has a brilliant futureRickertsen2 has a brilliant futureRickertsen2 has a brilliant futureRickertsen2 has a brilliant futureRickertsen2 has a brilliant future
Send a message via AIM to Rickertsen2 Send a message via Yahoo to Rickertsen2
Re: Advance Material List for the 2005 Competition Now Available!

The Pipe couplings indicate that the pipe will be used in lengths larger than 10ft.

EDIT::
NEvermind.... The couplings are a different size

I doubt this is the case, but it would be really cool if the magned was embedded in the floor and we had to use HAL sensors to figure out when we are over a certian point on the field.

It looks like there will be a raised platform but not a high one judging from the lack of support material. I picture the plywood supported by the 1x3s and 2x 3s layed on their side.

There will definately be something moving.

Judging by the aount of small hardware there willbe something small but complex.

I don't think the second thinner sheet of plywood will be supporting weight.
__________________
1139 Alumni
Reply With Quote