|
Re: Q/A questions so far..
Quote:
|
Originally Posted by innovativechic
even if you have to be touching the floor triangle to be -in- the loading zone, do you have to be -in- the loading zone to take a tetra?
also, if a robot is over the yellow triangle, but because of its chassis design does not -touch- the yellow triangle, does that count as in the loading zone?
|
The way I've seen it interpreted is that some part of your robot has to be touching the floor triangle to be considered "in" the loading zone....
__________________
Co-Chair Boilermaker Regional Planning Committee 2004-2011
2008 St. Louis Regional Finalists and Engineering Inspiration Award
2007 St. Louis Regional Champions - Thanks 1444 & 829! / St. Louis and Boilermaker Quality Award
2006 Boilermaker Chairman's Award
Referee - IRI - 2005, 2006, 2007, 2008
2005 Midwest Regional - Semifinalist, Engineering Inspiration Award, and Safety Award / Boilermaker Regional - Judges Award
2004 Midwest Regional Champions - Thanks 269 and 930! / IRI Runner-Up - Thanks to 234 and 447!!!
2004 Championship: Archimedes Finalist - Thanks 716 and 1272!
"We are going to be praised and criticized more than we deserve. We are not to be affected by either." ~ co-worker
|