View Single Post
  #10   Spotlight this post!  
Unread 01-19-2005, 11:19 AM
misterfoo misterfoo is offline
Controls Mentor
AKA: Ken Leigh
#0811 (Cardinals)
Team Role: Mentor
 
Join Date: Jan 2003
Location: Bishop Guertin HS, Nashua NH
Posts: 14
misterfoo is on a distinguished road
Re: Archimedes Screw

Quote:
Originally Posted by Gary C
Um...one of our team member had an idea like that:
It would be 9 foot lead screw that just lifted the tetras up that even if you figured out how to grab a tetra, you would have to make it implode on itself to fit size recquirements.
But, then again, maybe I'm just out of it and don't know what you want with a lead screw.

-Gary
We were looking at this type of collapse design, if you look at a typical 4 foot aluminum extension ladder, you can get 8 feet easily with a "lead screw" or
a winch and pulley.

If you are set on the lead screw, then look at the next diagram.

I also borrowed a picture from a barrel forklift repair manual.

http://www.morsemfgco.com/opsmanuals...E%202STAGE.pdf

This shows how to tie 2 lift pieces together and drive 1 while dragging the floater lift up in sync.

It is Your basic forklift, which you could replace the hydraulics (labeled as 31) with a lead screw.

I am sure Morse mfg will just love a thousand web hits on the repair manual page ;-)
Reply With Quote