View Single Post
  #14   Spotlight this post!  
Unread 05-01-2006, 15:40
Peter Matteson's Avatar
Peter Matteson Peter Matteson is offline
Ambitious but rubbish!
FRC #0177 (Bobcat Robotics)
Team Role: Engineer
 
Join Date: Sep 2003
Rookie Year: 2003
Location: South Windsor, CT
Posts: 1,653
Peter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond reputePeter Matteson has a reputation beyond repute
Re: **FIRST EMAIL**/Advance Materials List and Autodesk Virtual Kit of Parts Information

There are a LOT of 2x4s here 17 8ft long each and 2 10 footers. If this is half a field like in previous years this is big. Also I don't think FIRST would use 1/8 polycarb for a ramp as mentioned. It's too thin for safety. I'm thinking transparent scoring column of some sort.

I figure the 4 3/4" plywood sheets are load bearing platforms, the 2 1/4" are a player station and the 1/2" is either a wall or platform that sees lower impact.

I have to say after last year's move to simple set up and low cost I'm kind shocked at how extensive this is.

Pete
Reply With Quote