|
Re: Revised version of rules (help please)
on real engineering projects the requirements are often changed or altered after a project starts. Keeping track of the requirements (rules) is the job of a systems engineer.
Every team should have at least one person who is able to grasp all the rules that apply to the robot and the game, and who is responsible for keeping up with the updates throughout the build period, and advising the team when a change has occurrred that affects their design or strategy.
One person can do it. Its very hard for every person on your team to keep track of all the rules.
|