Quote:
|
Originally Posted by Dave Flowerday
Not according to the "2006 FIRST Welcome to Robotics Inspection Rev D" document on FIRST's website. Under "What's New for 2006":
Earlier in the same document, there is this statement:
(emphasis mine)
Notice the difference between "is required" and "is not required" - I guess it's not surprising that there's so much confusion over this rule...
|
Whoops! I'll take full responsibility for that one. An inspector pointed out that discrepancy to me last week. The "welcome doc" was not properly updated when it went to Rev D. Item #47 on page 12 should read "The team is required...".
Sorry about the confusion. FIRST is expecting that off-robot compressors will be wired and controlled exactly as if they were located on the robot (ie 20A breaker + Spike + on-robot battery + Nason pressure switch + RC to sense switch and enable the Spike).
Russ