View Single Post
  #13   Spotlight this post!  
Unread 31-08-2006, 21:54
DonRotolo's Avatar
DonRotolo DonRotolo is offline
Back to humble
FRC #0832
Team Role: Mentor
 
Join Date: Jan 2005
Rookie Year: 2005
Location: Atlanta GA
Posts: 6,991
DonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond reputeDonRotolo has a reputation beyond repute
Re: YMTC - Manufacturing

Quote:
Originally Posted by MikeDubreuil
Personally, it doesn't matter to me- as long as it was done for cost and not time savings. According to R16, this example would be against the rules. The parts were fabricated outside of the build season.

Quote:
Originally Posted by <R16>
During the Build Season: During the period between the Kick-off and robot shipment deadline, teams are to design and fabricate all the components and mechanisms required to complete their robot. They are encouraged to use all the materials, sources and resources available to them that are in compliance with the rules of the 2006 FIRST Robotics Competition. As the robot shipment deadline approaches, all work on the robot must cease and the robot must be placed in a “hands-off” condition. The entire robot (including all FABRICATED ITEMS intended for use during the competition in alternative configurations of the robot) must be crated and out of team hands by the robot shipment deadline.
Umm, what about the design part of R16? Designing the transmission outside the build season is also not allowed, or??

Don
__________________

I am N2IRZ - What's your callsign?
Reply With Quote