|
Re: Team 1111 "Heavy Mettle" Conceptual Design
Yeah, it's been planned to the day from the start, with Fridays "off," as built in catchup days if needed. Our head mentor wouldn't let us do anythiing until both strategy and design were complete.
We're split into Electrical, Programming, Drive/Chassis, Mechanism, and Controls. Plus, mechanism is so packed that we have the man power to do that splitting.
|