View Single Post
  #5   Spotlight this post!  
Unread 01-19-2007, 10:33 AM
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,763
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Re: pic: XBot 2007 electronics panel

I like the short runs of #6 and the central location of the blocks and Main breaker. The output of the main breaker must feed the distribution blocks before the fuse panels per the wiring diagram and Tips and Guidelines and

<R57> The 12V battery, the main 120-amp circuit breaker, the power distribution block, and circuit breaker distribution panels must be connected as shown in the 2007 Power Distribution Diagram.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.