Re: Extension Cables - keeping connected
Quote:
Originally Posted by Ken Delaney 357
This rule makes no sense. I don't know why taping the pmw connections together should be illegal. No one wants to win because the other team's robots pwm cables came apart. I hope they give this rule a good hard look, and either change it or create a product as skimoose suggested
|
The rule comes from the FRC side. Electrical tape can only be used as an insulator. No tape, of any kind, can be used to join components together.
Engineering doesn't involve duct tape. 
__________________
2009 CT Regional Motorola Quality Award
2010 VRC Connecticut Championship Winners & Amaze Award
2010 VRC Championship Divisional Energy Award
2010 WPI Regional Winner
2010 WPI Regional Engineering Inspiration Award
2011 WPI Regional Chairman's Award
2012 WPI Regional Finalists
|