View Single Post
  #8   Spotlight this post!  
Unread 02-02-2007, 15:07
Dave Flowerday Dave Flowerday is offline
Software Engineer
VRC #0111 (Wildstang)
Team Role: Engineer
 
Join Date: Feb 2002
Rookie Year: 1995
Location: North Barrington, IL
Posts: 1,366
Dave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond reputeDave Flowerday has a reputation beyond repute
Re: Banebot transmission no longer COTS?

Quote:
Originally Posted by AdamHeard View Post
According to the manual, such delays are excused and they are still legal parts.
Delays are excused: "Such delays due to higher-than-normal order rates are excused." Unavailability is not: "The VENDOR makes their products available to all FIRST Robotics Competition teams. VENDORS must not limit supply or make a product available to just a limited number of FIRST Robotics Competition teams." This is a permanent unavailability, not a delay.

I will not claim to be a materials-utilization-rules expert, but as I read this, the 256:1 gearbox which is no longer available now cannot be considered a COTS item, and wouldn't that mean that it is no longer legal for use by any team?