View Single Post
  #4   Spotlight this post!  
Unread 08-02-2007, 03:08
Tom Bottiglieri Tom Bottiglieri is offline
Registered User
FRC #0254 (The Cheesy Poofs)
Team Role: Engineer
 
Join Date: Jan 2004
Rookie Year: 2003
Location: San Francisco, CA
Posts: 3,187
Tom Bottiglieri has a reputation beyond reputeTom Bottiglieri has a reputation beyond reputeTom Bottiglieri has a reputation beyond reputeTom Bottiglieri has a reputation beyond reputeTom Bottiglieri has a reputation beyond reputeTom Bottiglieri has a reputation beyond reputeTom Bottiglieri has a reputation beyond reputeTom Bottiglieri has a reputation beyond reputeTom Bottiglieri has a reputation beyond reputeTom Bottiglieri has a reputation beyond reputeTom Bottiglieri has a reputation beyond repute
Re: Team 172 - Electrical Done!

Quote:
Originally Posted by Doug G View Post
According to the wiring diagram they sent us the returns on the 40 Amp circuits are to go to the distribution block not the ground on the other fuse panel. I guess it won't make much of a difference, but some inspectors may get a bit picky on this. Correct me if I'm wrong?
I hope thats not true. That would be a total waste, requiring teams with 4 CIM motors to use at least 3 of the ground blocks instead of just grounding on the smaller breaker panel. Maybe there's worries about the amperage of 4 Cims, 1 Mini Bike, and 2 FP going through that little metal plate?

Last edited by Tom Bottiglieri : 08-02-2007 at 03:11.