View Single Post
  #19   Spotlight this post!  
Unread 15-02-2007, 19:23
nreyesciena's Avatar
nreyesciena nreyesciena is offline
Electrithingy
AKA: Nelson Reyes Ciena
FRC #1872 (Yellow Fever)
Team Role: Mentor
 
Join Date: Feb 2007
Rookie Year: 2006
Location: Puerto Rico
Posts: 8
nreyesciena is an unknown quantity at this point
Send a message via MSN to nreyesciena
Re: Power distribution block mounting

We're gonna have to use the robot with the feed wires going directly to the hi-amp breaker and the ground common for now. Were gonna leave it all setup for when we get the DIN Rail in the regional (with the holes and the wires cut to the measure).

Can anyone tell me the distance between the edge of the DIN Rail to the nearest setup hole and the distance between each hole and how many of each of the red and black terminal are the minimum REQUIRED for the distribution block?

Thanks to everyone that helped us in any way in this thread.
__________________
"We have journeyed where none have been before. Now we return to ensure that none follow."

2006: Florida Event- Rookie Inspiration Award

2007: Boilermaker Regional and Buckeye Regional Events
Championship Event

2008: Florida Regional Event