View Single Post
  #13   Spotlight this post!  
Unread 27-03-2007, 12:06
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,795
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Re: Problems With The Power Distribution Block

Quote:
Originally Posted by Hieb View Post
I know that some manufacturers of similar power distribution blocks (not sure about Rockwell--I haven't spent enough time looking) have spring loaded connectors that may be more suitable for our applications. At least that way the vibration wouldn't loosen the screws and let the wires fall out.
Rockwell also has a line of spring loaded blocks to be used only for solid wire. Never use solid wire on moving devices, they will fatique and fail.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.