|
Re: pic: Track System
The tracks cost $300 a piece (2x=$600), and the material is cost covered by the team ($600), while Sam does the machining for them. Since you are not purchasing a finished assembly, rather the costs associated with the manufacturing, they do not fall under the same rule.
__________________
Team site: Q U I X I L V E R
My favorite tool is my imagination; I’m always finding new ways to use it.
|