|
Re: FVC GDC wants your feedback
Quote:
Originally Posted by sovierr
First, I have heard several people complain that the 2 fields were not running together in Atlanta.
|
Folks,
Maybe I am misunderstanding what you mean; but if you are talking about truly using two fields simultaneously, do the math.
(10 channels) minus (four robots multiplied by up to two channels per robot) = two crystals left for the second field....
Unless you start sorting robots according to the number of crystals they use, you can't plan to simultaneously use two fields consistently under the current FVC rules.
Blake
PS: I am assuming that the two fields are close enough to one another (so one audience can see both) for a transmitter on one field to reach a receiver on another field and that their is no intentional shielding installed between/around the fields.
__________________
Blake Ross, For emailing me, in the verizon.net domain, I am blake
VRC Team Mentor, FTC volunteer, 5th Gear Developer, Husband, Father, Triangle Fraternity Alumnus (ky 76), U Ky BSEE, Tau Beta Pi, Eta Kappa Nu, Kentucky Colonel
Words/phrases I avoid: basis, mitigate, leveraging, transitioning, impact (instead of affect/effect), facilitate, programmatic, problematic, issue (instead of problem), latency (instead of delay), dependency (instead of prerequisite), connectivity, usage & utilize (instead of use), downed, functionality, functional, power on, descore, alumni (instead of alumnus/alumna), the enterprise, methodology, nomenclature, form factor (instead of size or shape), competency, modality, provided(with), provision(ing), irregardless/irrespective, signage, colorized, pulsating, ideate
Last edited by gblake : 20-04-2007 at 12:10.
|