View Single Post
  #2   Spotlight this post!  
Unread 24-04-2007, 15:45
Travis Covington's Avatar Unsung FIRST Hero
Travis Covington Travis Covington is offline
Engineering Mentor
FRC #0254
Team Role: Engineer
 
Join Date: Oct 2001
Rookie Year: 1998
Location: San Jose, CA
Posts: 574
Travis Covington has a reputation beyond reputeTravis Covington has a reputation beyond reputeTravis Covington has a reputation beyond reputeTravis Covington has a reputation beyond reputeTravis Covington has a reputation beyond reputeTravis Covington has a reputation beyond reputeTravis Covington has a reputation beyond reputeTravis Covington has a reputation beyond reputeTravis Covington has a reputation beyond reputeTravis Covington has a reputation beyond reputeTravis Covington has a reputation beyond repute
Send a message via AIM to Travis Covington
Re: Designing Anodized Parts

Quote:
Originally Posted by M. Krass View Post
I'm curious how many teams that anodize their parts build their robot (or parts of it) first, then tear it down and send it off to be anodized.

I'd love to find the time and the resources to get our machines anodized, but usually I'll be hard pressed to take something apart once we've put it together and I'm a bit nervous about sending off parts that may not even fit together.
We never assemble anything before powdercoating or anodize. We check dimensions and slip fits, but do not do any final assembly at all. There simply isn't enough time, as you said.
__________________
-Travis Covington

2008-2017 - Engineering Mentor of Team 254
2001-2008 - Engineering Mentor of Team 968
1998-2001 - Mechanical Director/Driver/Member of Team 115