View Single Post
  #22   Spotlight this post!  
Unread 18-12-2007, 13:12
Doug Leppard's Avatar
Doug Leppard Doug Leppard is offline
Registered User
FRC #1902 (Exploding Bacon)
Team Role: Engineer
 
Join Date: Apr 2003
Rookie Year: 2003
Location: Orlando
Posts: 435
Doug Leppard has a reputation beyond reputeDoug Leppard has a reputation beyond reputeDoug Leppard has a reputation beyond reputeDoug Leppard has a reputation beyond reputeDoug Leppard has a reputation beyond reputeDoug Leppard has a reputation beyond reputeDoug Leppard has a reputation beyond reputeDoug Leppard has a reputation beyond reputeDoug Leppard has a reputation beyond reputeDoug Leppard has a reputation beyond reputeDoug Leppard has a reputation beyond repute
Send a message via AIM to Doug Leppard
Re: Project Management and FIRST?

Quote:
Originally Posted by Tom Bottiglieri View Post
Even if a team does not pursue a fully projected managed system, there are some valuable things that can be taken away from it.

1) Analysis of the Triple Constraint (Time vs. Cost vs. Scope)
2) "Fluff" time
3) Interteam trust
These are great points. Most teams try to do to much and often it is a one man or small group show.

Often the robot is seen as the hardware and so often the software people don't get time on it.
__________________
Doug Leppard
Reply With Quote