Thread: pic: Game hint
View Single Post
  #534   Spotlight this post!  
Unread 19-12-2007, 17:21
billbo911's Avatar
billbo911 billbo911 is offline
I prefer you give a perfect effort.
AKA: That's "Mr. Bill"
FRC #2073 (EagleForce)
Team Role: Mentor
 
Join Date: Mar 2005
Rookie Year: 2005
Location: Elk Grove, Ca.
Posts: 2,354
billbo911 has a reputation beyond reputebillbo911 has a reputation beyond reputebillbo911 has a reputation beyond reputebillbo911 has a reputation beyond reputebillbo911 has a reputation beyond reputebillbo911 has a reputation beyond reputebillbo911 has a reputation beyond reputebillbo911 has a reputation beyond reputebillbo911 has a reputation beyond reputebillbo911 has a reputation beyond reputebillbo911 has a reputation beyond repute
Re: pic: Game hint

Quote:
Originally Posted by jerry w View Post
actually our team did use the battery that way one year.

Come on Mr. Bill.
You have seen some of the things first has done in the past. Maybe they forgot that the 3 pin connector for a digital input has +5 volts on one of the pins. So, why connect to and draw power from the breaker panel to operate this board?

Did they need a 5 volt regulator on the board and on the robot controller?

I think you are looking at only half of the system here. for IR communication, the robot will have a transmitter. the IR receiver is the half that is placed on the field. we can use any old handheld remote for now. but we will have something else in the kit of parts.

jerry w

We've been known to use a battery that way as well. Why waste that much weight and compensate for it elsewhere?

I really doubt FIRST would "forget" +5vdc is there. But, then again, the GTS from the 2005 KOP required +12vdc. as well, and it had to come from the battery. Besides, here are some quotes from the Users Guide:
Quote:
"Assuming a 12VDC supply,"
and
Quote:
"Voltage should be in the range 7-15 volts
DC. Your power supply will have to be independent, for example, a 6 x AA
battery pack, 9V battery, 12V battery....."
So, if the robot will have the transmitter, then why manufacture one receiver board, at a minimum, per team and also spend the money and manpower on shipping?

As for a transmitter being in the KOP, I definitely agree, that is a possibility!

I guess all this back and forth is fine for now. We both will know for sure come Kick Off.
__________________
CalGames 2009 Autonomous Champion Award winner
Sacramento 2010 Creativity in Design winner, Sacramento 2010 Quarter finalist
2011 Sacramento Finalist, 2011 Madtown Engineering Inspiration Award.
2012 Sacramento Semi-Finals, 2012 Sacramento Innovation in Control Award, 2012 SVR Judges Award.
2012 CalGames Autonomous Challenge Award winner ($$$).
2014 2X Rockwell Automation: Innovation in Control Award (CVR and SAC). Curie Division Gracious Professionalism Award.
2014 Capital City Classic Winner AND Runner Up. Madtown Throwdown: Runner up.
2015 Innovation in Control Award, Sacramento.
2016 Chezy Champs Finalist, 2016 MTTD Finalist
Reply With Quote