Thread: The Field
View Single Post
  #3   Spotlight this post!  
Unread 06-01-2008, 17:22
David's Avatar
David David is offline
Registered User
FRC #1647 (Iron Devils)
Team Role: Leadership
 
Join Date: Jan 2007
Rookie Year: 2005
Location: New Jersey
Posts: 92
David is a jewel in the roughDavid is a jewel in the roughDavid is a jewel in the roughDavid is a jewel in the rough
Send a message via AIM to David
Re: The Field

[QUOT]6.2.2 The OVERPASS
The OVERPASS structure extends acoss the minor axis of the TRACK. The OVERPASS is constructed of 1-1/2 inch O.D. steel pipe and connecting hardware.[/quote]

So the official specs call for the overpass to be made of entirely steel pipe, however the team setup calls for 1in Iron pipe encased in 1-1/4in pvc pipe drawings, assembly instructions and a BOM can be found at http://www.usfirst.org/community/frc...t.aspx?id=7682

These are the individual documents.
http://www2.usfirst.org/2008comp/Dra...E/2008_TFE.pdf
http://www2.usfirst.org/2008comp/Dra...ly%20Guide.pdf
http://www2.usfirst.org/2008comp/Dra...ev4_010308.xls
__________________