View Single Post
  #3   Spotlight this post!  
Unread 14-01-2008, 01:02
ChrisH's Avatar Unsung FIRST Hero
ChrisH ChrisH is offline
Generally Useless
FRC #0330 (Beach 'Bots)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1998
Location: Hermosa Beach, CA
Posts: 1,230
ChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond reputeChrisH has a reputation beyond repute
Re: Field Creation Help

Screw the #23 black iron upright into the base. Slide PVC assembly A7 over #23. Screw iron cross #34 into place. Along with pipes #24 and #25 and elbow #35. Get everything tightened up. At this point you should have two pillars of iron pipe with a PVC covering. Turn the pipes until the ends of the two columns are close to one another. Install the union #36 and tighten everything up. You should be able to figure out the rest from there.
__________________
Christopher H Husmann, PE

"Who is John Galt?"