Quote:
Originally Posted by Greg Needel
This is not correct. According to rule 8.3.5.1
According to this as long as the amount which is used on the robot has a value less then 400 it is fine to use. I would even say a team would be hard pressed to find a 4x8 sheet of 3/8 aluminum less then $400.
|
If 4x8 is the
smallest size the material is sold in, then the entire 4x8 cost must be included in the BoM. You can prorate only when you buy in bulk sizes but smaller sizes are available.