View Single Post
  #2   Spotlight this post!  
Unread 14-01-2008, 22:29
EricH's Avatar
EricH EricH is online now
New year, new team
FRC #1197 (Torbots)
Team Role: Engineer
 
Join Date: Jan 2005
Rookie Year: 2003
Location: SoCal
Posts: 19,778
EricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond repute
Re: Cable Versus Chain

Quote:
Originally Posted by D Collins View Post
Our team is considering a lifting manipulator, and I was wondering if anybody had a preference of driving with either cable or chain.

Question 1: Cable or chain? Why?

Question 2: Drive one cable/chain from the middle or two cables/chains from the sides?
For a lift (like a forklift), I think most teams use cable. I believe that 330 often used one in the middle for a single-stage and then a two from the sides for additional stages. (Note: You should probably also plan to pull the lift down. A single cable attached to the same winch as the one to pull up should suffice.)
__________________
Past teams:
2003-2007: FRC0330 BeachBots
2008: FRC1135 Shmoebotics
2012: FRC4046 Schroedinger's Dragons

"Rockets are tricky..."--Elon Musk