|
Put up 2 field at Great Lakes!
Posted by Raul.
Engineer on team #111, Wildstang, from Rolling Meadows & Wheeling HS and Motorola.
Posted on 1/14/2000 9:35 PM MST
In Reply to: Throughput posted by Joe Johnson on 1/14/2000 7:00 PM MST:
Would it be so difficult to fit two field at Bowden (did I spell this correctly?) Fieldhouse? I suppose that FIRST will not have enough field because there are too many regionals happening simultaneously.
But wait, if they intend to put up 4 fields on 2 stages at Disney, then Great Lakes can still get 2 fields and the other smaller regionals running at the same time get just get one. Is that fair?
Raul
__________________
This message was archived from an earlier forum system. Some information may have been left out. Start new discussion in the current forums, and refer back to these threads when necessary.
|