View Single Post
  #7   Spotlight this post!  
Unread 28-01-2008, 17:10
EricH's Avatar
EricH EricH is offline
New year, new team
FRC #1197 (Torbots)
Team Role: Engineer
 
Join Date: Jan 2005
Rookie Year: 2003
Location: SoCal
Posts: 19,789
EricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond repute
Re: Overpass question. [HELP]

Quote:
Originally Posted by eagle33199 View Post
Add all those together, and you get 6 1/2' from the floor to the very top of the pipe that supports the ball. I would allow for some slight variation in your design, however - maybe give or take an inch.
Official word (in Section 6) is the variation (caused by different setup crews) is up to 1/4". They design the fields to go together the same way every time, so I'd take their word for it.
__________________
Past teams:
2003-2007: FRC0330 BeachBots
2008: FRC1135 Shmoebotics
2012: FRC4046 Schroedinger's Dragons

"Rockets are tricky..."--Elon Musk