|
Re: Musings from a FIRST Inspector
Thanks for the advice - this is the first year that I'm going to have to go to inspection with our robot and it was really helpful!
In regards to the power distribution block, my team found that either our wires would spread out over time, or our screws would loosen - if you're still having issues with your wires falling out of your block, try tightening them every morning before you run the robot. Also make sure that they are stripped to the proper length and inserted until the manual stop - these should all prevent the wires from falling out again.
|