Quote:
Originally Posted by 1075guy
Say Karthik, do you guys have like a machine shop set up in that school, or do you do all the work at Gov.Simcoe, and drag the robot to the field to practice?
|
During the build season, all work is done at Governor Simcoe, and the robots are dragged back and forth. Once build season is over, the practice robot lives at the practice facility (dubbed LB2 by 1114), and we bring everything that we would bring to compeition, along with some other tools to LB2. At times it's a bit of logistical hassle, with LB2 being 20 minutes from Governor Simcoe. Prior to this year, our practice facility (LB1) was within walking distance of Simcoe.