View Single Post
  #17   Spotlight this post!  
Unread 21-04-2008, 20:54
its da PAT!!!'s Avatar
its da PAT!!! its da PAT!!! is offline
Registered User
AKA: Pat Miller
FRC #0829 (Digital Goats)
Team Role: Mentor
 
Join Date: Feb 2007
Rookie Year: 2005
Location: indianapolis
Posts: 186
its da PAT!!! has a spectacular aura aboutits da PAT!!! has a spectacular aura aboutits da PAT!!! has a spectacular aura about
Send a message via AIM to its da PAT!!!
Re: pic: 2009 Control System, Mounted

I'm not going to lie to you guys but the power block wire connectors are so strong that the people from Diversified Systems put batter wire on it and pulled a full size 120 lbs robot around without the wire pulling out. The wire was only a foot long, it was amazing.
__________________

2012 Boilermaker Engineering Excellence Award
2010 Boilermaker Rockwell Automation Innovation in Control Award
2009 Buckeye J&J Gracious Professionalism Award
2009 Boilermaker J&J Gracious Professionalism Award
2008 Boilermaker J&J Gracious Professionalism Award
2007 St. Louis Regional Champion


Reply With Quote