View Single Post
  #12   Spotlight this post!  
Unread 12-08-2008, 08:28
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,770
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Re: 2009 Distribution Block

Please note that the Rockwell block has a specification for strip length that teams chose to ignore. Without stripping to 5/8", the wire was guaranteed to push out as the screws were tightened. The new Waco blocks have a similar specification. You must strip 1/2" of insulation for the wire to be properly terminated in the 745-85X block according to the manufacturer. You must strip 1/3" of insulation for the wire to be properly terminated in the 745-38X block according to the manufacturer. Their ability to stand up to robot movement will be tested during the beta testing. Please standby...

We might as well get this discussion going early, so let everyone know what the spec is.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.