View Single Post
  #15   Spotlight this post!  
Unread 12-08-2008, 15:17
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,770
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Re: 2009 Distribution Block

Quote:
Originally Posted by artdutra04 View Post
Perhaps someone who knows more about this can help me here, but is it possible to use split lock washers [between the top of the crimp connector and the bottom of the screw head - e.g. not between the main contact area of the connector and the terminal strip] on terminal strips to help prevent the screws from backing out?
Art,
I am guessing you are asking about the new PD panel. I believe the intent is to ship with a nut designed for the power studs. (I don't have time to go look up the spec sheet, but I think they are metric) As I remember, that nut has built in anti-back thread so that it won't come loose. In any installation, some method of locking the turning device is recommended. Also, plan on securing the wiring so that it won't be distrubed when changing batteries.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.